Friday, 16 March 2012

update- pre production.

The date is 16/03/12. So far in my pre production work I have finished the shot list, storyboard, and lyrics sheet. I have also been to every location I need for the music video and took pre production stills for every  location. I have started my breakdown sheets, risk assessments, and floor plans. by the end of todays lesson i intend to be half way through my camera plans.

No comments:

Post a Comment