The date is 16/03/12. So far in my pre production work I have finished the shot list, storyboard, and lyrics sheet. I have also been to every location I need for the music video and took pre production stills for every location. I have started my breakdown sheets, risk assessments, and floor plans. by the end of todays lesson i intend to be half way through my camera plans.
No comments:
Post a Comment